
Residential
Corfeehone
Location: Cavan
Images coming soon.

Flynn’s Pub & 4 Apartments, Belturbet, Co Cavan
Location: Belturbet, Co Cavan
Change of use of former public house known as Flynn’s along with the associated dwelling house above and adjoining to 4 apartments.
Works to include: Retain existing front façade and demolish structure to the rear, alterations to existing plans and elevations, provide bin store, landscaping, boundary treatments and all associated works at Kilconny, Belturbet, Co. Cavan H12 KW13

St Brigid’s Terrace – Phase 3
Location: Cavan Town
Demolition of 7 vacant properties and the construction of 20 residential units split across two blocks:
Block A: Two-storey, consisting of 4 no. 2-bedroom and 4 no. 1-bedroom apartments.
Block B: Three-storey, consisting of 6 no. 2-bedroom duplex units and 6 no. 1-bedroom apartments.

17 Houses, Killeshandra and Ballyjamesduff, Cavan
Location: Killeshandra and Ballyjamesduff, Co Cavan.
The first development consists of 9 No. Housing units, formation of new entrance and service road with associated parking and green areas, connect to all services and all ancillary and associated works at Derrylurgan, Ballyjamesduff, Co. Cavan. The second development consists of 8 No. Housing Units, connection to existing public services and all ancillary and associated works at Portaliffe, Killashandra, Co. Cavan.

St Brigid’s Terrace – Phase 1
Location: Cavan Town
Scope: Demolition of 8 dwellings and erection of 20 fully services dwellings in two three-storey split level blocks. Block ‘A’ containing six one-bed apartments over six two-bed duplex apartments facing onto St. Brigid’s Terrace and Block ‘B’ containing four two-bed duplex apartments over four one-bed apartments facing onto James Connolly Road/ Dublin Road. boundary treatments, landscaping and ancillary site works, relocation of existing pedestrian access from St. Brigid’s Terrace to James Connelly Street, parking, connection to public foul & storm water sewers, public watermains and all ancillary site works.

13 Houses, Kilnaleck
Location: Kilnaleck, Co Cavan
Construction of 13 housing units in two residential developments. The first development consisted of constructing 4 bungalows and a minor demolishment, refurbishment, and construction of an extension to an existing bungalow, formation of new entrance and service road and all associated site works at 157 Barrack road, Kilnaleck.
The second development consisted of the demolition, renovation and extension of an existing two storey premises to form 4 maisonette units and the construction of a new two storey unit consisting of 4 maisonette units, connect to existing public services and all ancillary and associated works at premises known as Briody Hardware, Main St, Kilnaleck, Co. Cavan.

7 Houses, Ballyhaise
Location: Ballyhaise, Co Cavan
Construction of 7 Housing Units at Townparks, Ballyhaise, Co. Cavan. The works included the demolition of an existing dwelling house and a detached garage, the erection of 7 fully serviced two-storey terraced houses, parking provision, connection to public foul & storm water sewers, public watermains and all ancillary site works.

8 Houses, Lakepoint, Mullingar
Location: Mullingar, Co Westmeath
Scope: Construction of 8 no. residential units with a turnkey finish
